Smart Curtain Motor Manufacturer introduces how to inst […]
Smart Curtain Motor Manufacturer introduces how to install electric curtains:
1. Before installing the electric curtain, you must install a track, you need to measure the fixed hole position and the total length of the track. If the track is arc-shaped, then you must use an additional measurement method. After the measurement is completed, you can install it on the wall. Draw a line on the top and set the installation position for the track.
2. After the positioning is completed, you can install the hoisting clip to the motor. The clip is installed with screws. First, rotate the clip 90° to connect it to the track normally, and then use the self-tapping screw to connect the clip and the top plate to each other.
3. Next is the connection of the motor. After connecting the wires according to the instructions, the motor and the track can be connected to each other. The motor has a specially configured transmission box. One end is connected to the motor is the main transmission box, and the other end is the auxiliary transmission. The installation method is to put the motor into the main transmission box at 90°, rotate 90° clockwise, and then push the card to the limit position of the transmission box, and the connection can be completed after it is automatically locked.
4. Adjust the operation of the motor, and the method of adjustment should be in accordance with the manufacturer's manual of the electric curtain.